|
| Manufacturing |
| Name |
Quantity |
Volume |
Price per unit (Buy) |
Total cost (Buy) |
Total cost (Optimal) |
 |
Tripped Power Circuit |
3.176,00 |
31,76 |
2.851,00 |
9.054.776,00 |
9.054.776,00 |
 |
Contaminated Nanite Compound |
6.351,00 |
63,51 |
74.510,00 |
473.213.010,00 |
473.213.010,00 |
 |
Fried Interface Circuit |
9.526,00 |
95,26 |
2.000,00 |
19.052.000,00 |
19.052.000,00 |
 |
Contaminated Lorentz Fluid |
10.584,00 |
105,84 |
133.200,00 |
1.409.788.800,00 |
1.409.788.800,00 |
 |
Defective Current Pump |
10.584,00 |
105,84 |
13.920,00 |
147.329.280,00 |
147.329.280,00 |
 |
Smashed Trigger Unit |
10.584,00 |
105,84 |
13.550,00 |
143.413.200,00 |
143.413.200,00 |
 |
Tangled Power Conduit |
10.584,00 |
105,84 |
130.000,00 |
1.375.920.000,00 |
1.375.920.000,00 |
 |
Damaged Artificial Neural Network |
10.584,00 |
105,84 |
190,50 |
2.016.252,00 |
2.016.252,00 |
 |
Charred Micro Circuit |
10.584,00 |
105,84 |
244,30 |
2.585.671,20 |
2.585.671,20 |
 |
Conductive Polymer |
10.584,00 |
105,84 |
24.950,00 |
264.070.800,00 |
264.070.800,00 |
| |
|
931,41 |
|
3.846.443.789,20 |
3.846.443.789,20 |
| Profit |
| Name |
Quantity |
Volume |
Price per unit |
Total |
Total |
| Standup L-Set Advanced Component Manufacturing Efficiency I |
1 |
20 m3 |
5.729.000.000,00 |
5.729.000.000,00 |
5.729.000.000,00 |
| |
| Manufacturing costs |
-3.846.443.789,20 |
-3.846.443.789,20 |
-3.846.443.789,20 |
| Profit |
1.882.556.210,80 |
1.882.556.210,80 |
1.882.556.210,80 |
| Profit per cost |
49 % |
49 % |
0 % |
|