Adam4EVE    Material influence of 'Capacitor Console'   v0.0.17
ESI available TQ: 12424
Influence of 'Capacitor Console' price on end product build cost
Product Group Category Quantity Sell (%) Buy (%) Total cost Trade volume    
Small Capacitor Control Circuit II Rig Core Module 1 9 7 1.924.646 776.880.391 Chart BuildCalc
Small Semiconductor Memory Cell II Rig Core Module 1 9 7 1.924.646 142.972.970 Chart BuildCalc
Large Capacitor Control Circuit II Rig Core Module 6 3 2 36.567.510 9.700.146.930 Chart BuildCalc
Large Semiconductor Memory Cell II Rig Core Module 15 3 3 71.223.710 2.801.914.468 Chart BuildCalc
Capital Capacitor Control Circuit II Rig Core Module 30 3 2 173.740.756 2.213.530.497 Chart BuildCalc
Medium Semiconductor Memory Cell II Rig Core Module 3 3 3 14.334.765 630.962.623 Chart BuildCalc
Capital Semiconductor Memory Cell II Rig Core Module 75 3 3 353.461.556 1.875.841.851 Chart BuildCalc
Medium Capacitor Control Circuit II Rig Core Module 1 2 2 8.845.465 3.149.825.265 Chart BuildCalc
Standup M-Set Invention Cost Optimization II Structure Engineering Rig M - Invention Cost Optimization Structure Module 16 0 0 713.389.754 1.037.231.982 Chart BuildCalc
Standup M-Set Invention Accelerator II Structure Engineering Rig M - Invention Accelerator Structure Module 16 0 0 713.389.754 946.499.972 Chart BuildCalc
Standup M-Set ME Research Accelerator II Structure Engineering Rig M - ME Research Accelerator Structure Module 16 0 0 713.389.754 1.082.133.319 Chart BuildCalc
Standup M-Set Blueprint Copy Accelerator II Structure Engineering Rig M - Blueprint Copy Accelerator Structure Module 16 0 0 713.389.754 916.776.008 Chart BuildCalc
Standup M-Set TE Research Accelerator II Structure Engineering Rig M - TE Research Accelerator Structure Module 16 0 0 713.389.754 930.299.996 Chart BuildCalc
Standup M-Set Blueprint Copy Cost Optimization II Structure Engineering Rig M - Blueprint Copy Cost Optimization Structure Module 16 0 0 713.389.754 2.196.999.936 Chart BuildCalc
Standup M-Set Moon Drilling Stability II Structure Drilling Rig M - Stability Structure Module 28 0 0 3.044.563.679 3.425.312.480 Chart BuildCalc
Standup M-Set Moon Drilling Efficiency II Structure Drilling Rig M - Efficiency Structure Module 28 0 0 3.044.563.679 2.820.000.000 Chart BuildCalc
Select material
Current selection
Capacitor Console
Group:Salvaged Materials
Category:Material
Hint
An improved version of this page is available on dev.adam4eve.eu
Help
Type a material in the top box of this column.

This page provides you a list of the end products that have the selected material in their build material recipe. Furthermore it lists the amount that this material contributes to the total build cost of that product.

Two use cases for this:

  • You've got the opportunity to buy a material cheap and want to know which product cost you can push down furthest to undercut competition.
  • You've spottet a material in shortage and spiking and want to quickly buy the most affected product in order to sell with profit once the additional cost has pushed the price.

HowTo IMG
Valid XHTML EVE Online Apache Webserver PHP MySQL Firefox Twitter @adam4eve YouTube Adam4Eve channel Support via Patreon